Logo
Description
Payment methods

Description

Uninterrupted and reliable supply of drinking water to Spitamen, Dushanbe and nearby villages is carried out in several stages: purified water is delivered through the main networks of the Vodokanal to the "entrances" of the city, then the water moves through the intra-block networks of transporter companies to the "entrance" of the houses, the next stage is the intra-house networks.
In winter, the water is heated to the optimum temperature to bring it to the district heating stations and boiler houses. In order to avoid freezing, intra-block cold water supply pipelines are laid together with heating networks.

Payment methods

  • LogoMasterCard
  • LogoVisa
  • LogoQiwi
  • LogoWebMoney
  • LogoYandex